Heavy Equipment and Forklift Rental in Makkah

Makkah projects are hotels and tall buildings on rocky, mountainous ground, so they need high-reach lifting, digging and rock-breaking equipment, and deep foundations. We supply it and deliver to your site in under 48 hours.

Delivery to Makkah in under 48 hours

Equipment most used in Makkah

All equipment

Building high around the central area

Makkah concentrates hotel, tower and service-building projects, many of them multi-storey and built in long phases. They need a tower crane through the structure phase, concrete pumps for casting on high floors, and a mobile crane for heavy lifts and equipment installation.

Mountainous, rocky ground

Makkah is surrounded by mountains, and many sites are rocky. Before building comes digging and levelling, where an excavator works with a hydraulic breaker to break the rock, and dump trucks haul the spoil off site. Tall buildings on this ground need deep foundations, so piling and deep drilling rigs are used, and mobile crushers can crush the spoil on site for reuse.

Delivery and coordination

We deliver to your site in Makkah in under 48 hours, with a driver or operator, or without, depending on the equipment. Because Makkah sites are often on busy streets or high ground, we agree the delivery time and access route with you in advance.

Questions about equipment rental in Makkah

How long does delivery to Makkah take?

We deliver to your site in Makkah in under 48 hours, and agree the delivery time and site access with you in advance.

My site is on rock. What equipment do I need to dig?

An excavator alone is usually not enough in rock, so a hydraulic breaker is fitted to break it first, and dump trucks then haul the spoil away. Send the digging area and depth and we will suggest suitable sizes.

Do you supply piling rigs for high-rise foundations?

Yes. We supply piling and deep drilling rigs for building and tower foundations. Include the pile diameter and depth in your request.